Operation guide of vertical lathe

2017 02/18

Single column vertical lathe preparatory work before working:

1 Strictly observe lubrication chart to add oil.

2 As for unoperated more than 8 hours equipment,Before starting the lathe machine, Keep slow running test for 3-5 minutes to check whether the lubrication system is smooth.

Several preparatory work durning vertical lathe working

1 Frequently check the various parts of the equipment operation and lubrication system work.

2 It's forbidden to place tools,workpieces and metal objects on guide surface and the protective cover.

3 Several cleaning work after vertical lathe working

1 Clean iron and coolant on the surface, make sure screw is without black oil.

2 Cleaning iron and debris around lathe machine.